Can I buy directly as an end customer (consumer)?Our distribution is done exclusively through the specialist electrician and installation companies. This guarantees the correct planning and design of the components and the professional assembly, mains connection and commissioning.
Are there any public subsidies for the products?In Europe, there are many different funding programs that vary greatly depending on the country.
For Austria, you can get an overview of the funding opportunities in the funding compass of the association PV Austria:
https://pvaustria.at/foerderungen/
Where can I find prices for all products?As a professional company (electrician, solar installer) please register in our system and we will contact you to discuss further steps.
As an end customer, send us a short message with your address and we will name our partners in your area. They can then provide you with prices for your request. Your address will not be passed on.
Wie lange ist Lieferzeit auf die Produkte?Üblicherweise sind alle Produkte lagernd und können sofort ausgeliefert werden. Eine genaue Info über die Verfügbarkeit erhalten registrierte Kunden in unserem Online Bestellsystem.
Can the SigenStor be loaded asymmetrically in backup mode?In backup mode or with the zero export setting, each three-phase SigenStor can permanently supply up to one third of its power per phase on the AC side without one of the other phases being loaded, e.g. a 10 kW device can supply a single-phase load with up to 3.3 kW if enough PV power and/or battery power is available.
What is the nominal power in back-up mode?In backup mode, the SigenStor can provide its nominal power permanently and for 10s up to 150% of the rated power. Again, the only requirement is that enough PV power and/or battery power is available. The battery power is only used if the PV power is not sufficient. If the PV power is greater than the AC-side requirement, the battery is charged (even in backup mode).
Is the SigenStor black start capable?Black start capable: As soon as a specific battery charge level is reached, the backup supply will be automatically resumed. In this process, the learned load profile and the expected PV (photovoltaic) performance should also be taken into account. The final tuning of the individual functions for controlling the backup operation is not yet complete. With the next software update at the end of November, these functions will be activated.
Do the SigenStor and the generator run in parallel in backup power mode?Parallel operation of PV and external generator is possible. In this case, grid is disconnected from the system and generator serves as the grid. SigenStor automatically measures the voltage and frequency of generator and adjusts its output power to make sure its power not higher than the needed power by loads. SigenStor and generator can provide power to loads at the same time.